2ZR-FE ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


PROCEDURE

Hide 89429F 1.INSTALL ENGINE OIL TEMPERATURE SENSOR

Hide 16620 2.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

a.

When replacing the V-ribbed belt tensioner assembly with a new one.

i.

Install the V-ribbed belt tensioner assembly to the engine assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)

NOTICE:

Make sure to install a new V-ribbed belt tensioner assembly with the pin and white cover installed to it.



ii.

Remove the white cover.


iii.

Rotate the V-ribbed belt tensioner assembly slightly clockwise and remove the pin that is used to keep the spring compressed.

NOTICE:

Do not forcibly rotate the V-ribbed belt tensioner assembly to the V-ribbed belt installation position with the pin installed.


HINT:

When installing the V-ribbed belt, rotate the V-ribbed belt tensioner assembly clockwise again with the pin removed, and secure the V-ribbed belt tensioner assembly using a 5 mm hexagon wrench.




b.

When reusing the V-ribbed belt tensioner assembly.

i.

Check that the 3 mm hexagon wrench is installed to the V-ribbed belt tensioner assembly.


ii.

Install the V-ribbed belt tensioner assembly to the engine assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


iii.

Rotate the V-ribbed belt tensioner assembly slightly clockwise and remove the 3 mm hexagon wrench that is used to keep the spring compressed.

NOTICE:

Do not forcibly rotate the V-ribbed belt tensioner assembly to the V-ribbed belt installation position with the 3 mm hexagon wrench installed.


HINT:

When installing the V-ribbed belt, rotate the V-ribbed belt tensioner assembly clockwise again with the 3 mm hexagon wrench removed, and secure the V-ribbed belt tensioner assembly using a 5 mm hexagon wrench.




Hide 16262 6.INSTALL WATER INLET HOSE

a.

Install the water inlet hose and slide the 2 clips to secure it.


Hide 16261 7.INSTALL NO. 1 WATER BY-PASS HOSE

a.

Install the No. 1 water by-pass hose to the cylinder head sub-assembly and slide the clip to secure it.


Hide 16268 8.INSTALL NO. 1 WATER BY-PASS PIPE

a.

Install the No. 1 water by-pass pipe with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 16267 9.CONNECT NO. 3 WATER BY-PASS HOSE

a.

Connect the No. 3 water by-pass hose to the water inlet housing and slide the clip to secure it.


Hide 12261 10.INSTALL VENTILATION HOSE

a.

Install the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.


Hide 12321B 12.INSTALL DRIVE SHAFT HEAT INSULATOR SUB-ASSEMBLY

Hide 17167 13.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

Hide 11452 14.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

a.

Apply a light coat of engine oil to a new O-ring.


b.

Install the O-ring to the engine oil level dipstick guide.


c.

Install the engine oil level dipstick guide with the bolt.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


d.

Install the engine oil level dipstick.


Hide 23250 15.INSTALL FUEL INJECTOR ASSEMBLY

Hide 23807V 16.INSTALL NO. 1 DELIVERY PIPE SPACER

Hide 23807 17.INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Hide 23901 18.CONNECT FUEL TUBE SUB-ASSEMBLY

Hide 17111 19.INSTALL INTAKE MANIFOLD

a.

Install a new No. 1 intake manifold to head gasket to the intake manifold.


b.

Install the intake manifold and intake manifold stay with the 5 bolts and 2 nuts.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)


c.

Connect the ventilation hose to the intake manifold and slide the clip to secure it.


d.

Connect the No. 1 water by-pass hose and No. 2 water by-pass hose and slide the 2 clips to secure them.


e.

Connect the air tube to the cylinder head cover sub-assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 25719 20.INSTALL VACUUM SURGE TANK

a.

Install the vacuum surge tank with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

Connect the No. 2 air hose and No. 3 air hose.