1ZR-FE BATTERY / CHARGING GENERATOR INSTALLATION
PROCEDURE
27020
1.INSTALL GENERATOR ASSEMBLY
a.
Install the wire harness clamp bracket with the bolt.
- Torque:
- 8.4 N*m (86 kgf*cm, 74 in.*lbf)
b.
Temporarily install the generator assembly with the bolt.
c.
Temporarily install the adjusting bar with the 2 bolts.
d.
Connect the generator assembly connector and engage the wire harness clamp.
e.
Connect the wire harness to terminal B and install the nut.
- Torque:
- 9.8 N*m (100 kgf*cm, 87 in.*lbf)
f.
Install the terminal cap.
g.
Tighten the bolt.
- Torque:
- 25 N*m (255 kgf*cm, 18 ft.*lbf)
16361A
2.INSTALL V-RIBBED BELT
11212
3.INSTALL NO. 2 CYLINDER HEAD COVER
4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- NOTICE:
-
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
-
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION