2NZ-FE ENGINE CONTROL ECM INSTALLATION
PROCEDURE
89668 1.INSTALL NO. 2 ECM BRACKET
Install the No. 2 ECM bracket to the ECM with the 2 screws.
- Torque:
- 3.0 N*m (31 kgf*cm, 27 in.*lbf)
89667 2.INSTALL NO. 1 ECM BRACKET
Install the No. 1 ECM bracket to the ECM with the 2 screws.
- Torque:
- 3.0 N*m (31 kgf*cm, 27 in.*lbf)
89661 3.INSTALL ECM
Engage the clamp and install the ECM with the 3 bolts.
- Torque:
- 12.5 N*m (127 kgf*cm, 9 ft.*lbf)
- NOTICE:
-
If the ECM has been struck or dropped, replace it.
Engage the wire harness clamp.
Connect the 2 ECM connectors and lower the 2 levers.
- NOTICE:
- ·
When connecting the ECM connectors, make sure that dirt, water or other foreign matter does not contact the connecting parts of the ECM connectors.
·Be sure to securely connect the ECM connectors.
17751 4.INSTALL INLET NO. 1 AIR CLEANER
Install the inlet No. 1 air cleaner with the bolt.
- Torque:
- 7.0 N*m (71 kgf*cm, 62 in.*lbf)
17701 5.INSTALL AIR CLEANER CASE SUB-ASSEMBLY
17705 6.INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
11212 7.INSTALL NO. 2 CYLINDER HEAD COVER
8.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- NOTICE:
-
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
-
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
9.PERFORM INITIALIZATION