2NZ-FE STARTING  STARTER  INSTALLATION  


PROCEDURE

Hide 28100 1.INSTALL STARTER ASSEMBLY

a.

Install the starter assembly with the 2 bolts.

Torque:
37 N*m (377 kgf*cm, 27 ft.*lbf)


b.

Connect the starter assembly connector.


c.

Connect terminal 30 with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Close the terminal cap.


Hide 2.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL