HEATING / AIR CONDITIONING CONDENSER INSTALLATION
PROCEDURE
88467 1.INSTALL NO. 1 COOLER CONDENSER CUSHION
Install the 4 No. 1 cooler condenser cushions.
88450 2.INSTALL CONDENSER WITH RECEIVER ASSEMBLY
Engage the 2 guides to install the condenser with receiver assembly as shown in the illustration.
- NOTICE:
-
Do not damage the condenser or radiator when installing the condenser with receiver assembly.
- HINT:
-
If a new condenser with receiver assembly is installed, add compressor oil to the condenser as follows.
- Capacity:
Add 40 cc (1.35 fl. oz)
- Compressor Oil:
ND-OIL 8 or equivalent
88710 3.CONNECT AIR CONDITIONER TUBE ASSEMBLY
Remove the vinyl tape from the air conditioner tube assembly and the connecting part of the condenser with receiver assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the tube joint.
- Compressor Oil:
ND-OIL 8 or equivalent
Install the O-ring to the air conditioner tube assembly.
Install the air conditioner tube assembly to the condenser with receiver assembly with the bolt.
- Torque:
- 5.4 N*m (55 kgf*cm, 48 in.*lbf)
88703 4.CONNECT DISCHARGE HOSE SUB-ASSEMBLY
Remove the vinyl tape from the discharge hose sub-assembly and the connecting part of the condenser with receiver assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the tube joint.
- Compressor Oil:
ND-OIL 8 or equivalent
Install the O-ring to the discharge hose sub-assembly.
Install the discharge hose sub-assembly to the condenser with receiver assembly with the bolt.
- Torque:
- 5.4 N*m (55 kgf*cm, 48 in.*lbf)
16712 5.INSTALL NO. 2 FAN SHROUD
for 2NZ-FE:
Click hereEngine / Hybrid System>2NZ-FE COOLING>RADIATOR>INSTALLATION
for 1ZR-FE:
Click hereEngine / Hybrid System>1ZR-FE COOLING>RADIATOR>INSTALLATION
for 2ZR-FE:
Click hereEngine / Hybrid System>2ZR-FE COOLING>RADIATOR>INSTALLATION
16261N 6.CONNECT NO. 2 WATER BY-PASS HOSE
for 2NZ-FE:
Click hereEngine / Hybrid System>2NZ-FE COOLING>RADIATOR>INSTALLATION
for 1ZR-FE:
Click hereEngine / Hybrid System>1ZR-FE COOLING>RADIATOR>INSTALLATION
for 2ZR-FE:
Click hereEngine / Hybrid System>2ZR-FE COOLING>RADIATOR>INSTALLATION
53205 7.INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY
for 2NZ-FE:
Click hereEngine / Hybrid System>2NZ-FE COOLING>RADIATOR>INSTALLATION
for 1ZR-FE:
Click hereEngine / Hybrid System>1ZR-FE COOLING>RADIATOR>INSTALLATION
for 2ZR-FE:
Click hereEngine / Hybrid System>2ZR-FE COOLING>RADIATOR>INSTALLATION
16533 8.INSTALL UPPER RADIATOR SUPPORT
for 2NZ-FE:
Click hereEngine / Hybrid System>2NZ-FE COOLING>RADIATOR>INSTALLATION
for 1ZR-FE:
Click hereEngine / Hybrid System>1ZR-FE COOLING>RADIATOR>INSTALLATION
for 2ZR-FE:
Click hereEngine / Hybrid System>2ZR-FE COOLING>RADIATOR>INSTALLATION
53510 9.INSTALL HOOD LOCK ASSEMBLY
10.INSTALL FRONT BUMPER ASSEMBLY
11.CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
12.WARM UP ENGINE
13.INSPECT FOR REFRIGERANT LEAK
53301 14.ADJUST HOOD SUB-ASSEMBLY