2NZ-FE EMISSION CONTROL PURGE VALVE INSPECTION
PROCEDURE
25860
1.INSPECT PURGE VALVE (PURGE VSV)
a.
0.104,0.042 0.417,0.198
0.313,0.156
10
false
*a
| *a | Component without harness connected
(Purge Valve (Purge VSV)) |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 23 to 26 Ω
If the result is not as specified, replace the purge valve (purge VSV).
b.
0.542,0.438 0.448,0.438
0.448,0.438 0.448,1.104
false
0.938,1.813 1.042,1.813
1.042,1.813 1.104,1.323
false
0.74,1.74 1.052,1.896
0.313,0.156
10
false
*a
0.583,0.365 0.896,0.521
0.313,0.156
10
false
*b
1.583,1.708 1.896,1.865
0.313,0.156
10
false
*c
2.115,0.156 2.427,0.354
0.313,0.198
10
false
*d
| *a | Port (E) |
| *b | Port (F) |
| *c | Air |
| *d | Component without harness connected
(Purge Valve (Purge VSV)) |
Apply battery voltage between the terminals of the purge valve (purge VSV) and check that the following occurs when blowing air into the port (E).
- Standard:
Condition Specified Condition Battery voltage applied between terminals 1 and 2 Air flows from port (F) Battery voltage not applied between terminals 1 and 2 Air does not flow
If the result is not as specified, replace the purge valve (purge VSV).